Search Jobs
Sr. Electrical Estimator – Industrial EPC & Data Center Construction
Houston, TX
$150,000 - $180,000
Location: Houston, TX | Schedule: Full-time, on-site, 40-45 hours per week, Monday through Friday | Compensation: Competitive salary based on experience
Overview
An established engineering and construction organization is expanding its presence in the rapidly growing data center market, alongside ongoing work in chemical, petrochemical, oil and gas, and other heavy industrial sectors. The company is seeking an experienced Sr. Electrical Estimator to support a growing portfolio of large-scale construction projects nationwide, collaborating with engineering, procurement, and construction teams to develop accurate, competitive estimates. Prior data center experience is not required.
What you'll do
- Prepare detailed electrical and instrumentation estimates for complex construction projects
- Review drawings, specifications, and bid documents to determine project scope and requirements
- Perform quantity takeoffs and calculate material, labor, equipment, and subcontractor costs
- Evaluate supplier and subcontractor quotations for accuracy and competitiveness
- Collaborate with engineering, procurement, and construction teams throughout the bidding process
- Analyze labor productivity, material pricing, and project-specific cost considerations
- Participate in pre-bid meetings, site visits, and project walkdowns
- Develop proposal documentation and final bid packages
- Maintain historical cost data and support improvements in estimating accuracy
Required qualifications
- Electrical construction estimating experience within industrial, commercial, EPC, or mission-critical construction
- Ability to interpret electrical drawings, specifications, and construction documents
- Knowledge of electrical materials, installation methods, and construction labor requirements
- Experience with quantity takeoffs, cost estimating, and subcontractor bid evaluations
- Proficiency in Microsoft Excel
- Strong analytical, organizational, and communication skills
- Ability to work independently and travel nationwide as needed
Preferred qualifications
- Familiarity with Bluebeam, McCormick, Accubid, or similar estimating software preferred
- Bachelor's degree in Engineering, Construction Management, or a related field preferred, not required
- Data center construction experience is a plus, not required
Compensation and benefits
- Competitive salary based on experience
- Competitive per diem for project-related travel
- Comprehensive medical, dental, and vision insurance
- 401(k) with immediate company matching and vesting
- Health savings and flexible spending account options
- Short-term and long-term benefits
- Employee discount programs
Why this role
This is an opportunity to apply electrical estimating expertise to major infrastructure projects nationwide, within an established organization expanding its presence in the data center market.
"*" indicates required fields